Introduction:
Leena Electro Mechanical undertook the “25 KV, AC, 50 HZ, OHE in Connection with Construction of 3rd line between Basai (Excluding) – Bijrautha (Excluding) Section [28 TKM]” project for the North Central Railway of Jhansi Division. This involved not only meticulous precision but also working on the Betwa River bridge, adding complexity to an already demanding project. Working over water required additional planning and execution strategies to ensure project success amidst unique environmental challenges.
Challenge and Solution:
The Company, led by project manager Mr. Ahmad Ali Shah, successfully tackled the challenge of aligning eight critical holes despite misaligned foundation bolts. Through meticulous planning and ingenuity, they crafted template plates to achieve precise alignment, ensuring the project’s success. Mr. Ahmad Ali’s leadership and the team’s collective effort exemplify their commitment to overcoming obstacles with finesse. The task was complicated by foundation bolts that had been incorrectly grouted by external agencies, leaving them unmatched. However, through ingenuity and meticulous planning, the team at Leena Electro Mechanical not only addressed this obstacle but emerged triumphant. Aligning the foundation bolts was essential for a project’s success, but misaligned bolts posed a significant obstacle. Leena Electro Mechanical’s solution was ingenious yet straightforward: crafting template plates to match each hole meticulously. With meticulous adjustments, they ensured precise alignment, overcoming the challenge with finesse.
Execution and Success:
With determination and precision, Leena Electro Mechanical tackled each bolt systematically, achieving perfect alignment. Despite initial setbacks, they triumphed, completing the task flawlessly and surpassing expectations.
Conclusion: Leena Electro Mechanical’s success underscores its commitment to excellence. Through innovation and teamwork, they overcame obstacles, leaving behind a legacy of triumph in precision engineering.